Park connectors are the green paths that join one park to the next. They run along canals, rivers, reservoir edges and road reserves, usually as a paved track wide enough for walkers and cyclists to share, with trees on one or both sides. For many residents they are the most used public space after the void deck: the route for an evening run, a weekend bicycle ride with children, or a quiet walk to the next estate.
The National Parks Board (NParks) builds and manages them. This article explains how the network fits together, the long routes that residents talk about, which neighbourhoods sit on each, and the path rules that apply. For the parks the connectors join, see our parks and playgrounds by planning area.
How the network grew
The first park connector opened around 1990, and NParks marked 25 years of the network in September 2015, when it passed 300 kilometres with the opening of the Central Urban Loop. Since then the network has kept growing, and NParks now plans an island-wide network of recreational routes, park connectors and trails together, reaching 360 kilometres by 2035.
Not every stretch is a separate route. Many connectors are short links, a kilometre or two along a canal, that make sense only as part of a longer journey. NParks therefore groups them into loops and long-distance routes, each with signs, maps and places to rest.
The five loops
NParks groups its connectors into five loops:
- Eastern Coastal Loop. The oldest loop, a chain of connectors in the east linking the coastal parks with the towns inland. It suits riders who want long flat stretches near the sea.
- North Eastern Riverine Loop. Follows the Sungei Serangoon and Sungei Punggol through Punggol, Sengkang and Hougang, linking Punggol Park, Punggol Waterway Park, Punggol Point and Sengkang Riverside Park, with Coney Island at its northern edge.
- Central Urban Loop. Opened in September 2015 as the fifth loop, about 36 kilometres long. It links the two eastern loops with each other and with parks further in, and NParks said it gave residents of Hougang and MacPherson a route onto the riverine loop via the Serangoon Park Connector.
- Northern Explorer Loop. Links Lower Seletar Reservoir, the Mandai Park Connector, Sembawang and Admiralty Park in the north. It is hillier than the eastern loops.
- Western Adventure Loop. Links parks, nature areas and green corridors in the west of the island.
NParks publishes a map and a downloadable guide for each loop on its park connector website.
The Round Island Route
The Round Island Route (RIR) is the network's flagship. First announced in 2012, it is planned as a continuous 150-kilometre route that loops right round the island, linking park connectors, parks, nature areas and places of interest. When complete, NParks says it will be the longest recreational connection in Singapore.
What is open
NParks opened Phase One, the 75-kilometre eastern half, on 22 January 2022. It runs from Rower's Bay at Lower Seletar Reservoir in the north-east to Berlayer Creek near Labrador in the south, by way of:
- Sengkang Riverside Park, where the Sengkang Riverside Bridge crosses the Sungei Punggol;
- Pasir Ris Park;
- Changi Beach Park and the Changi Point coastal walk, with two cycling bridges at Changi Bay totalling 140 metres and a boardwalk and lookout pavilion;
- East Coast Park, from Area H near the Changi coastal walk to Area A near Rhu Cross;
- and on through the city fringe to Berlayer Creek, at the junction of Alexandra Road and Telok Blangah Road.
Each of these points is an RIR node, with a shelter for resting. Marine-themed tiles mark parts of the coastal stretch.
What is still to come
The western half, around the north and west coasts, is still being built in stages. NParks has not published a completion date for the whole loop on its RIR page; its plan for the wider 360-kilometre network runs to 2035. Parts of the west, such as industrial and military areas, need more planning before a continuous public route is possible.
Which neighbourhoods sit on it
Phase One passes through or along these guide areas: Sengkang, Punggol, Pasir Ris, Changi, Bedok, Marine Parade and the city fringe to Bukit Merah. For residents of these areas, a long ride along the coast starts at the nearest node.
Other long routes
The Coast-to-Coast Trail
Launched in March 2019, the Coast-to-Coast Trail is a 36-kilometre route that crosses the island from Jurong Lake Gardens in the west to Coney Island Park in the north-east. It links park connectors, nature parks and the edges of the Central Catchment, and NParks' map marks checkpoints along the way.
The Rail Corridor
The Rail Corridor follows the land of the old Malayan railway, which ran 24 kilometres from Woodlands in the north to Tanjong Pagar in the south until 2011. NParks and URA reopened the central and southern stretches in 2021 after improvement works, and opened Rail Corridor (North) on 10 February 2023, giving more than 21 kilometres of continuous route from Kranji MRT station southwards.
Highlights include the conserved truss bridges at Upper Bukit Timah Road and Bukit Timah Road, the former Bukit Timah Railway Station, now a community node, and the Kranji node opposite Kranji MRT station. The corridor is open around the clock but has no lighting except at major junctions, to protect nocturnal wildlife. In 2026, a section of Rail Corridor (South) between Henderson Road and Spooner Road is closed for a second phase of trail improvements; check NParks' Rail Corridor site before setting out. URA and NParks have said they are working towards reopening the former Tanjong Pagar Railway Station after 2026.
The Eastern Corridor
The Eastern Corridor is an 18-kilometre route linking Pasir Ris Park and East Coast Park inland, through Bedok Reservoir Park and new connectors along Tampines Avenues 9 and 10 and the Sungei Bedok. It gives eastern residents an alternative to the coastal route.
The Southern Ridges
The Southern Ridges join Mount Faber Park, Telok Blangah Hill Park, HortPark, Kent Ridge Park and Labrador with elevated walkways and bridges, among them Henderson Waves. They are better on foot than by bicycle, with steps and steep sections.
Rules on the paths
Park connectors are shared paths, used by walkers, runners, cyclists and some device users at once. The Land Transport Authority (LTA) sets the rules for where devices may go and how fast, and they apply on park connectors as on any other public path:
- Speed: the limit on cycling paths and shared paths is 25 km/h; on footpaths it is 10 km/h.
- Bicycles and power-assisted bicycles may use park connectors and cycling paths. Power-assisted bicycles and e-scooters must meet LTA's device rules, and their riders must have passed LTA's online theory test.
- Personal mobility aids, such as mobility scooters and motorised wheelchairs, are limited to 6 km/h on public paths from 1 June 2026.
- Pedestrian-only paths, marked as such, are closed to bicycles and devices.
Good manners matter as much as the rules. Keep left, slow down near children and older walkers, ring a bell before overtaking, and give way at junctions and bridges. Our article on cycling, walking and active-mobility rules explains LTA's rules in full.
Planning a ride or walk
- Start at a node or an MRT station. RIR nodes have shelters; many loops pass within a few minutes of a station.
- Go early or late. Heat and sun are the main hazards. Most connectors have trees, but coastal stretches are exposed.
- Carry water. Parks have toilets and water points, but some stretches between parks are long.
- Check closures. NParks posts closures for works, and lightning alerts close exposed areas.
- Bring lights. Some routes, such as the Rail Corridor, are unlit at night.
Park connectors and choosing a home
For many households, a park connector within a few minutes' walk is worth as much as a park. It turns exercise into a daily routine and lets children ride without crossing busy roads. When you look at a home, find the nearest connector on NParks' map and walk from the block to it. Our neighbourhood guides list the main parks and connectors in their parks and recreation sections, and our guide to things to do by neighbourhood sets each area's parks beside its other leisure options.
Frequently asked questions
How long is the park connector network?
NParks passed 300 kilometres in September 2015 and plans an island-wide network of recreational routes, connectors and trails reaching 360 kilometres by 2035.
Is the Round Island Route finished?
No. The 75-kilometre eastern half from Rower's Bay to Berlayer Creek opened in January 2022. The western half is being built in stages.
Can I ride an e-scooter on a park connector?
Only a device that meets LTA's rules, ridden by someone who has passed LTA's theory test, and never above 25 km/h. E-scooters are banned from footpaths.
Is the Rail Corridor lit at night?
No, apart from major junctions, to protect nocturnal wildlife.
Where does the Coast-to-Coast Trail start?
At Jurong Lake Gardens in the west, ending at Coney Island Park in the north-east, about 36 kilometres away.
Sources
- NParks, Round Island Route page (pcn.nparks.gov.sg) and release on Phase One, 22 January 2022; NParks, 25 years of the Park Connector Network, 20 September 2015; NParks park connector loop pages.
- MND, speech by Minister Lawrence Wong at the launch of the Round Island Route node at Rower's Bay and the Coast-to-Coast Trail, March 2019.
- NParks and URA, Rail Corridor (North) opening, 10 February 2023; MND speech at the reopening of Rail Corridor (Central), 2021; NParks Rail Corridor site, notice of 9 March 2026.
- NParks, Eastern Corridor completion.
- LTA, Rules and Code of Conduct and Where Devices Are Allowed (9 March 2026); LTA release on tighter active-mobility regulations from 1 June 2026, 3 February 2026.