Transport · MRT and LRT guide

Downtown Line: stations, route and extensions

The blue line, underground and driverless, linking Bukit Panjang and Bukit Timah with the city, Geylang, Bedok and Tampines.

The Downtown Line is the blue line on the map. It is about 42 km long with 35 stations, its codes start with DT, and SBS Transit operates it. LTA describes it as the longest underground driverless line in Singapore: it runs below ground from Bukit Panjang in the north-west, through Bukit Timah and the city, and out to Tampines and Expo in the east. Two more stations open at the eastern end on 26 December 2026, and LTA plans a northern extension for 2035. This page is part of our MRT and LRT guide.

Artist's impression, illustrative only: an elevated MRT viaduct curving through a green Singapore estate at golden hour
Artist's impression. Illustrative only.

The route in three parts

The line is easiest to picture in three sections, which match the order in which it was built.

In the north-west, it starts at Bukit Panjang, where it meets the Bukit Panjang LRT, and runs south-east through Cashew, Hillview and Hume to Beauty World. It then follows the Bukit Timah corridor through King Albert Park, Sixth Avenue and Tan Kah Kee to Botanic Gardens, Stevens and Newton.

In the city, it calls at Little India and Rochor, then makes a loop through the centre: Bugis, Promenade, Bayfront, Downtown, Telok Ayer and Chinatown, before heading back north to Fort Canning, Bencoolen and Jalan Besar.

In the east, it runs through Bendemeer and Geylang Bahru, then Mattar, Macpherson and Ubi, and on through Kaki Bukit, Bedok North and Bedok Reservoir to Tampines West, Tampines, Tampines East and Upper Changi, ending at Expo beside the Changi Airport branch.

Every station in order

Stations in service run from DT1 to DT35. The second table lists the stations LTA has announced: Xilin and Sungei Bedok at the eastern end, opening on 26 December 2026, and DE1 and Sungei Kadut on the northern extension, targeted for 2035.

Stations in service, in order (35)

CodeStationOther lines hereeGuide area
DT1Bukit PanjangBP6Bukit Batok, Bukit Panjang, Choa Chu Kang
DT2Cashew–Bukit Panjang
DT3Hillview–Bukit Batok, Bukit Panjang
DT4Hume–Bukit Batok
DT5Beauty World–Bukit Timah
DT6King Albert ParkCR15 2032Bukit Timah
DT7Sixth Avenue–Bukit Timah
DT8Tan Kah Kee–Bukit Timah
DT9Botanic GardensCC19Tanglin
DT10StevensTE11Novena, Tanglin
DT11NewtonNS21Newton
DT12Little IndiaNE7Kallang, Rochor
DT13Rochor–Rochor
DT14BugisEW12Downtown Core
DT15PromenadeCC4Downtown Core
DT16BayfrontCC34Downtown Core
DT17Downtown–Downtown Core
DT18Telok Ayer–Downtown Core, Outram
DT19ChinatownNE4Outram
DT20Fort Canning–Museum, Singapore River
DT21Bencoolen–Museum, Rochor
DT22Jalan Besar–Rochor
DT23Bendemeer–Kallang
DT24Geylang Bahru–Kallang
DT25Mattar–Geylang
DT26MacphersonCC10Geylang
DT27Ubi–Geylang
DT28Kaki Bukit–Bedok
DT29Bedok North–Bedok
DT30Bedok Reservoir–Bedok
DT31Tampines West–Tampines
DT32TampinesEW2Tampines
DT33Tampines East–Tampines
DT34Upper Changi–Tampines
DT35ExpoCG1Tampines

Stations announced by LTA, with the target year (4)

CodeStationLTA targetOther lines hereeGuide area
DT36Xilin26 Dec 2026–Tampines
DT37Sungei Bedok26 Dec 2026TE31 26 Dec 2026Bedok
DE1Station DE1 (LTA lists it by code)2035–Sungei Kadut
DE2Sungei Kadut2035NS6 2035Sungei Kadut

Interchanges

  • Bukit Panjang (DT1) with the Bukit Panjang LRT.
  • Botanic Gardens (DT9) with the Circle Line.
  • Stevens (DT10) with the Thomson-East Coast Line.
  • Newton (DT11) with the North-South Line.
  • Little India (DT12) with the North East Line.
  • Bugis (DT14) with the East-West Line.
  • Promenade (DT15) and Bayfront (DT16) with the Circle Line.
  • Chinatown (DT19) with the North East Line.
  • Macpherson (DT26) with the Circle Line.
  • Tampines (DT32) with the East-West Line.
  • Expo (DT35) with the East-West Line's airport branch.

From 26 December 2026, Sungei Bedok (DT37) adds an interchange with the Thomson-East Coast Line at TE31. King Albert Park (DT6) is planned as a Cross Island Line interchange at CR15 in 2032, and Sungei Kadut will link the Downtown Line with the North-South Line in 2035.

Opening history, stage by stage

StageSectionLength and stationsOpened
Downtown Line 1Bugis to Chinatown4.3 km, 6 stations22 December 2013
Downtown Line 2Bukit Panjang to Rochor16.6 km, 12 stations27 December 2015
Downtown Line 3Fort Canning to Expo21 km, 16 stations21 October 2017
Hume stationbetween Hillview and Beauty World1 station28 February 2025
Downtown Line 3 extensionExpo to Sungei Bedok2 stations26 December 2026
Downtown Line 2 extensionBukit Panjang to Sungei Kadut2 stations2035 (LTA target)

The city loop came first in 2013, then the north-western arm in 2015, which brought four stations to the Bukit Timah Road corridor. The eastern arm in 2017 completed the original plan. Hume, an in-fill station between Hillview and Beauty World, opened in February 2025 with the code DT4.

The eastern extension adds Xilin (DT36) in Tampines and Sungei Bedok (DT37) in Bedok. LTA announced the opening date on 4 November 2026, together with the Thomson-East Coast Line's fifth stage. Our TEL5 and DTL3e article has the details of both.

Deep stations and a driverless fleet

All Downtown Line trains are driverless. Because much of the line runs under older parts of the city, some stations are very deep. LTA names Bencoolen, about 43 m below ground, as the deepest station on the line.

Areas the line serves

The line has exits in Bukit Panjang, Choa Chu Kang, Bukit Batok, Bukit Timah, Tanglin, Novena, Newton, Rochor, Kallang, the Museum area, the Singapore River area, the Downtown Core, Outram, Geylang, Bedok and Tampines, with Sungei Kadut to follow in 2035.

Planning areaURA regionStations openStations announcedResidents (June 2026)eGuide page
Bukit BatokWest30165,680Area profile
Bukit PanjangWest30135,110Full guide
Choa Chu KangWest10185,520Area profile
Bukit TimahCentral4086,720Full guide
TanglinCentral2025,190Area profile
NovenaCentral1053,930Area profile
NewtonCentral1010,390Area profile
KallangCentral30102,550Area profile
RochorCentral4012,640Full guide
Downtown CoreCentral506,230Full guide
OutramCentral2017,010Area profile
MuseumCentral20860Area page
Singapore RiverCentral104,770Area profile
GeylangCentral30121,350Area profile
BedokEast31272,120Full guide
TampinesEast51296,060Full guide
Sungei KadutNorth02700Area page

A station on a boundary counts in each area it touches. Residents: SingStat, June 2026; the 17 areas together had 1,496,830 residents.

Bukit Timah shows what the line changed: four of its six stations, from Beauty World to Tan Kah Kee, are on the Downtown Line. Tampines already has five Downtown Line stations and gains a sixth when Xilin opens, and Bedok gains Sungei Bedok. The Rochor and Downtown Core guides list the city stations.

Living along the Downtown Line

The line ties together places with very different populations. At its eastern end, Tampines and Bedok are two of Singapore's largest towns: SingStat counted 296,060 residents in Tampines and 272,120 in Bedok in June 2026. In the north-west, the line serves Bukit Panjang, with 135,110 residents, and passes Bukit Batok and Choa Chu Kang. In between, it runs through Bukit Timah's private estates and the city centre, where far fewer people live.

For the eastern towns, the Downtown Line gives a second route into the city alongside the East-West Line, reaching Bugis and Marina Bay by a more northerly path through Geylang, Kallang and Rochor. For Bukit Panjang and Bukit Timah, it is the main fast route into the centre.

Frequently asked questions

Who operates the Downtown Line?

SBS Transit, which also runs the North East Line and the Sengkang and Punggol LRT.

When do Xilin and Sungei Bedok open?

On 26 December 2026, together with Bedok South and Sungei Bedok on the Thomson-East Coast Line.

What is DE1?

The first station on the Downtown Line 2 extension north of Bukit Panjang. LTA lists it by its code, with Sungei Kadut beyond it, and targets 2035 for both.

Is the Downtown Line underground all the way?

Yes. LTA describes it as the longest underground driverless line in Singapore.

Which towns gain from the 2026 extension?

Tampines gains Xilin and Bedok gains Sungei Bedok, which also becomes an interchange with the Thomson-East Coast Line.

Sources

  • Land Transport Authority, Downtown Line page: length, station count, stage lengths and opening dates, Hume and Bencoolen.
  • Land Transport Authority news release, 4 November 2026: Downtown Line 3 extension opens on 26 December 2026.
  • Land Transport Authority, Downtown Line 2 and 3 extensions page: DE1 and Sungei Kadut in 2035.
  • Land Transport Authority, rail system map and MRT station exits (data.gov.sg, 18 October 2026).