Transport · MRT and LRT guide

Thomson-East Coast Line: stations, stages and what is next

The newest MRT line, built in five stages from the Johor Strait at Woodlands to the East Coast, now reaching Bedok.

The Thomson-East Coast Line is the brown line on the map and the sixth MRT line in Singapore. Its codes start with TE, and SMRT operates it. Today it runs from Woodlands North, near the Johor Strait, south through Thomson and Orchard into Marina Bay, then east along the coast to Bayshore. With its fifth stage, opening on 26 December 2026, it reaches Bedok South and Sungei Bedok. LTA gives the completed line as about 43 km with 32 stations, a total that includes three stations which open with the developments around them. Our MRT and LRT guide sets out how it fits the wider network.

The line is driverless, and LTA notes that its four-car trains are fully automated. LTA also notes that from this line onwards, every entrance to a new station is barrier-free.

Artist's impression, illustrative only: commuters on the long escalators of a deep MRT station
Artist's impression. Illustrative only.

From Woodlands to the East Coast

The line starts in the north at Woodlands North, Woodlands and Woodlands South, then runs through Springleaf in Yishun and Lentor and Mayflower in Ang Mo Kio. It continues south through Bright Hill and Upper Thomson in Bishan and Caldecott in Toa Payoh, passes Mount Pleasant, which is built but not open, and reaches Stevens.

From Napier and Orchard Boulevard it runs below Orchard Road at Orchard, then through Great World and Havelock to Outram Park, Maxwell and Shenton Way. Marina Bay is followed by Marina South, which is also built and waiting for its development, and then Gardens by the Bay.

East of the gardens the line crosses to Tanjong Rhu, then follows the East Coast through Katong Park, Tanjong Katong, Marine Parade, Marine Terrace, Siglap and Bayshore. From December 2026 it continues to Bedok South and Sungei Bedok.

Station list

The first table shows the 27 stations in service. The second shows Bedok South and Sungei Bedok with their opening date, and the three stations whose opening LTA has tied to their surroundings: Mount Pleasant (TE10), Marina South (TE21) and Founders' Memorial (TE22A).

Stations in service, in order (27)

CodeStationOther lines hereeGuide area
TE1Woodlands North–Woodlands
TE2WoodlandsNS9Woodlands
TE3Woodlands South–Woodlands
TE4Springleaf–Yishun
TE5Lentor–Ang Mo Kio
TE6Mayflower–Ang Mo Kio
TE7Bright HillCR13 2030Bishan
TE8Upper Thomson–Bishan
TE9CaldecottCC17Toa Payoh
TE11StevensDT10Novena, Tanglin
TE12Napier–Tanglin
TE13Orchard Boulevard–Orchard, River Valley
TE14OrchardNS22Orchard, River Valley
TE15Great World–River Valley, Singapore River
TE16Havelock–Bukit Merah
TE17Outram ParkEW16NE3Bukit Merah, Outram
TE18Maxwell–Downtown Core, Outram
TE19Shenton Way–Downtown Core
TE20Marina BayNS27CC33Downtown Core, Straits View
TE22Gardens by the Bay–Marina South
TE23Tanjong Rhu–Kallang
TE24Katong Park–Kallang, Marine Parade
TE25Tanjong Katong–Marine Parade
TE26Marine Parade–Marine Parade
TE27Marine Terrace–Bedok, Marine Parade
TE28Siglap–Bedok
TE29Bayshore–Bedok

Stations announced by LTA, with the target year (5)

CodeStationLTA targetOther lines hereeGuide area
TE10Mount Pleasantwith the surrounding development––
TE21Marina Southwith the surrounding development–Marina South, Straits View
TE22AFounders' Memorialwith the surrounding development––
TE30Bedok South26 Dec 2026–Bedok
TE31Sungei Bedok26 Dec 2026DT37 26 Dec 2026Bedok

Interchanges

  • Woodlands (TE2) with the North-South Line.
  • Caldecott (TE9) with the Circle Line.
  • Stevens (TE11) with the Downtown Line.
  • Orchard (TE14) with the North-South Line.
  • Outram Park (TE17) with the East-West and North East lines.
  • Marina Bay (TE20) with the North-South and Circle lines.

From 26 December 2026, Sungei Bedok (TE31) joins the Downtown Line at DT37. Bright Hill (TE7) is planned as an interchange with the Cross Island Line at CR13, targeted for 2030.

Five stages, 2020 to 2026

StageStationsOpened
TEL1Woodlands North, Woodlands, Woodlands South31 January 2020
TEL2Springleaf to Caldecott (6 stations)28 August 2021
TEL3Stevens to Gardens by the Bay (11 stations)13 November 2022
TEL4Tanjong Rhu to Bayshore (7 stations)23 June 2024
TEL5Bedok South and Sungei Bedok26 December 2026

The three Woodlands stations ran on their own for about eighteen months. The second stage linked them to the Circle Line at Caldecott, and the third, in November 2022, brought the line through Orchard into the city and Marina Bay. The fourth stage in June 2024 opened the East Coast section, giving Marine Parade its first MRT stations. The fifth stage was announced by LTA on 4 November 2026; our TEL5 and DTL3e article covers it.

Stations that wait for their surroundings

Three stations on the line have been planned so that they open when the places around them are ready. Mount Pleasant (TE10), between Caldecott and Stevens, will open with the development around it. Marina South (TE21) has been built, and trains pass through it today. Founders' Memorial (TE22A) will open with the Founders' Memorial at Bay East Garden. LTA's line page sets out this approach for all three.

Beyond 2026

LTA's annual report for 2024/25 lists an extension of the Thomson-East Coast Line and the Cross Island Line to Changi Airport Terminal 5 for the mid-2030s. In the north, the Johor Bahru–Singapore RTS Link has its Singapore station at Woodlands North, near TE1. LTA and Malaysia's Ministry of Transport stated in October 2026 that passenger service is expected to start in February 2027, subject to safety certification and regulatory approvals.

The areas along the line

The Thomson-East Coast Line has exits in Woodlands, Yishun, Ang Mo Kio, Bishan, Toa Payoh, Novena, Tanglin, Orchard, River Valley, the Singapore River area, Bukit Merah, Outram, the Downtown Core, Straits View, Marina South, Kallang, Marine Parade and Bedok.

Planning areaURA regionStations openStations announcedResidents (June 2026)eGuide page
WoodlandsNorth30255,280Full guide
YishunNorth10231,030Full guide
Ang Mo KioNorth-East20159,330Full guide
BishanCentral2087,810Area profile
Toa PayohCentral10148,940Area profile
NovenaCentral1053,930Area profile
TanglinCentral2025,190Area profile
OrchardCentral201,550Area profile
River ValleyCentral3013,350Area profile
Singapore RiverCentral104,770Area profile
Bukit MerahCentral20144,690Full guide
OutramCentral2017,010Area profile
Downtown CoreCentral306,230Full guide
Straits ViewCentral11none recordedArea page
Marina SouthCentral11none recordedArea page
KallangCentral20102,550Area profile
Marine ParadeCentral4048,490Full guide
BedokEast32272,120Full guide

A station on a boundary counts in each area it touches. Residents: SingStat, June 2026; the 18 areas together had 1,572,270 residents.

Marine Parade is the area it changed most: all four of its stations sit on this line. Bedok gains two more in December 2026, adding to Marine Terrace, Siglap and Bayshore. Woodlands, a full guide, has three stations at its northern end.

Living along the line

The line connects two of the largest northern towns with the East Coast. SingStat counted 255,280 residents in Woodlands and 231,030 in Yishun in June 2026, and 272,120 in Bedok, which gains two more stations in December 2026. In between it serves Ang Mo Kio and Bishan, the private estates of Thomson and Tanglin, and the city. Marine Parade, with 48,490 residents, had no MRT station inside the planning area until the line's fourth stage opened.

Frequently asked questions

When did the Thomson-East Coast Line open?

In stages: the first three stations on 31 January 2020, and the fourth stage, to Bayshore, on 23 June 2024. The fifth opens on 26 December 2026.

Why do some stations not open with the rest of the line?

LTA has tied Mount Pleasant, Marina South and Founders' Memorial to the developments around them, so each opens when its surroundings are ready.

Does the line go to Changi Airport?

Not today. LTA's annual report lists an extension to Terminal 5, together with the Cross Island Line, for the mid-2030s.

Who operates it?

SMRT.

Which areas gain stations in December 2026?

Bedok gains Bedok South and Sungei Bedok, and Sungei Bedok links the line with the Downtown Line.

Sources

  • Land Transport Authority, Thomson-East Coast Line page: length, station count, stage opening dates, automated trains, barrier-free entrances and the three stations tied to developments.
  • Land Transport Authority news release, 4 November 2026: TEL5 opens on 26 December 2026.
  • Land Transport Authority, Annual Report 2024/25: Thomson-East Coast and Cross Island lines to Terminal 5 in the mid-2030s.
  • Land Transport Authority and Malaysia's Ministry of Transport, RTS Link update, October 2026.
  • Land Transport Authority, rail system map and MRT station exits (data.gov.sg, 18 October 2026).