The Jurong Region Line is the new rail line for Singapore's west. LTA's project page gives it a length of about 24 km with 25 stations, built in three stages from 2028 to 2029. Its station codes start with JS on the main line, JE on the branch towards Jurong East and JW on the branch towards Nanyang Technological University. Trains will be stabled at a new depot in Tengah. This page lists every station; for the wider picture see our MRT and LRT guide.
The line is designed to serve the western towns that today depend on the North-South and East-West lines, and the new town of Tengah, which has no rail station at present.

A line with three arms
The main line (JS) starts at Choa Chu Kang, beside the North-South Line and the Bukit Panjang LRT, and runs south through Choa Chu Kang West into Tengah, with stations at Tengah and Hong Kah. It continues through Corporation and Jurong West to Bahar Junction and Boon Lay, where it meets the East-West Line, then heads south through Enterprise and Tukang to Jurong Hill and Jurong Pier, near the coast.
The east branch (JE) leaves the main line in Tengah and runs east through Tengah Plantation and Tengah Park to Bukit Batok West, then Toh Guan and Jurong East, where riders can change to both of the oldest MRT lines. It ends beyond Jurong Town Hall at Pandan Reservoir.
The west branch (JW) runs from Bahar Junction through Gek Poh and Tawas towards the university, with Nanyang Gateway, Nanyang Crescent and Peng Kang Hill at its end.
Stages and target years
| Stage | Stations | LTA target |
|---|---|---|
| Stage 1 | JS1 to JS8 and JW1 to JW2, Choa Chu Kang to Boon Lay and Gek Poh to Tawas | 2028 |
| Stage 2 | JE1 to JE7, Tengah Plantation to Pandan Reservoir | 2028 |
| Stage 3 | JS9 to JS12 and JW3 to JW5, Enterprise to Jurong Pier and Nanyang Gateway to Peng Kang Hill | 2029 |
| In-fill station | JS2A, between Choa Chu Kang West and Tengah | mid-2030s |
Every station
All the stations are planned, so the table shows each one with LTA's target, the lines it will link with and the eGuide area where it falls. The in-fill station JS2A is listed by code.
Stations announced by LTA, with the target year (25)
| Code | Station | LTA target | Other lines here | eGuide area |
|---|---|---|---|---|
| JS1 | Choa Chu Kang | 2028 | NS4BP1 | Choa Chu Kang |
| JS2 | Choa Chu Kang West | 2028 | – | Choa Chu Kang |
| JS2A | In-fill station JS2A (LTA lists it by code) | mid-2030s | – | – |
| JS3 | Tengah | 2028 | – | Tengah |
| JS4 | Hong Kah | 2028 | – | Tengah |
| JS5 | Corporation | 2028 | – | Jurong West |
| JS6 | Jurong West | 2028 | – | Jurong West |
| JS7 | Bahar Junction | 2028 | – | Jurong West |
| JS8 | Boon Lay | 2028 | EW27 | Jurong West |
| JS9 | Enterprise | 2029 | – | Jurong West |
| JS10 | Tukang | 2029 | – | Boon Lay |
| JS11 | Jurong Hill | 2029 | – | Boon Lay |
| JS12 | Jurong Pier | 2029 | – | Boon Lay |
| JE1 | Tengah Plantation | 2028 | – | Tengah |
| JE2 | Tengah Park | 2028 | – | Tengah |
| JE3 | Bukit Batok West | 2028 | – | Bukit Batok |
| JE4 | Toh Guan | 2028 | – | Jurong East |
| JE5 | Jurong East | 2028 | NS1EW24 | Jurong East |
| JE6 | Jurong Town Hall | 2028 | – | Jurong East |
| JE7 | Pandan Reservoir | 2028 | – | Jurong East |
| JW1 | Gek Poh | 2028 | – | Jurong West |
| JW2 | Tawas | 2028 | – | Western Water Catchment |
| JW3 | Nanyang Gateway | 2029 | – | Western Water Catchment |
| JW4 | Nanyang Crescent | 2029 | – | Western Water Catchment |
| JW5 | Peng Kang Hill | 2029 | – | Western Water Catchment |
Interchanges
- Choa Chu Kang (JS1) with the North-South Line and the Bukit Panjang LRT.
- Boon Lay (JS8) with the East-West Line.
- Jurong East (JE5) with the North-South and East-West lines.
- Jurong Pier (JS12) with the third phase of the Cross Island Line, targeted for the late 2030s.
Trains and depot
The line will run 62 driverless trains. Each has three cars, and LTA's design allows a fourth car to be added later. The trains will be based at Tengah Depot.
Areas that gain stations
The line's stations fall in Choa Chu Kang, Tengah, Bukit Batok, Jurong East, Jurong West, Boon Lay and the Western Water Catchment.
eGuide area pages on this route: Choa Chu Kang, Tengah, Jurong West, Boon Lay, Bukit Batok, Jurong East, Western Water Catchment.
| Planning area | URA region | Stations open | Stations announced | Residents (June 2026) | eGuide page |
|---|---|---|---|---|---|
| Choa Chu Kang | West | 0 | 2 | 185,520 | Area profile |
| Tengah | West | 0 | 4 | 34,340 | Area profile |
| Jurong West | West | 0 | 6 | 250,890 | Full guide |
| Boon Lay | West | 0 | 3 | 30 | Area page |
| Bukit Batok | West | 0 | 1 | 165,680 | Area profile |
| Jurong East | West | 0 | 4 | 72,160 | Area profile |
| Western Water Catchment | West | 0 | 4 | 590 | Area page |
A station on a boundary counts in each area it touches. Residents: SingStat, June 2026; the 7 areas together had 709,210 residents.
Jurong West, one of our full guides, gains the most: six stations, from Corporation to Enterprise, plus Gek Poh. Tengah gains four, its first rail stations, and Jurong East gains four on the east branch. Tukang, Jurong Hill and Jurong Pier fall in the Boon Lay planning area, and the four west-branch stations from Tawas onwards lie in the Western Water Catchment.
What the line will change
The Jurong Region Line brings rail to parts of the west that are some way from today's lines, including the new town of Tengah. SingStat counted 250,890 residents in Jurong West, 185,520 in Choa Chu Kang, 165,680 in Bukit Batok and 72,160 in Jurong East in June 2026. Tengah, the newest HDB town, had 34,340 residents and is still growing.
For Jurong West, the line adds six stations across the town, compared with three East-West Line stations today, all in the south of the town. For Tengah, it brings the town's first rail stations. For Jurong East, it adds a third line at the Jurong East interchange and new stations at Toh Guan, Jurong Town Hall and Pandan Reservoir. For students and staff at the university, the west branch will bring rail to the campus area in 2029.
Linking the west to the rest
The line joins the network at three points from its first stages: Choa Chu Kang for the North-South Line and the Bukit Panjang LRT, Boon Lay for the East-West Line and Jurong East for both of the oldest lines. In the late 2030s, Jurong Pier will add a link with the Cross Island Line, which will run east towards the city and the north-east. Each of the areas on the route has an eGuide page listing its planned stations with their target years.
Frequently asked questions
When does the Jurong Region Line open?
LTA targets 2028 for Stages 1 and 2 and 2029 for Stage 3. The in-fill station JS2A follows in the mid-2030s.
Where will it connect with the MRT?
At Choa Chu Kang, Boon Lay and Jurong East, and later with the Cross Island Line at Jurong Pier.
Does it serve NTU?
Yes. The west branch ends at Nanyang Gateway, Nanyang Crescent and Peng Kang Hill, in the third stage, targeted for 2029.
How many stations does Tengah get?
Four: Tengah and Hong Kah on the main line, and Tengah Plantation and Tengah Park on the east branch.
Which areas gain the most stations?
Jurong West gains six stations plus Gek Poh, Tengah gains four and Jurong East gains four.
Sources
- Land Transport Authority, Jurong Region Line project page: length, stations, stages and target years, interchanges, trains and Tengah Depot.
- Land Transport Authority, Cross Island Line project page: link at Jurong Pier in Phase 3.
- URA, Master Plan 2025 rail station names (data.gov.sg), placed on planning-area boundaries.