Singapore's rail network opened with five stations on a single stretch of track. Almost four decades later it has six MRT lines, three LRT systems and, on LTA's count, more than 180 stations. This article tells that story stage by stage, from the first trains between Yio Chu Kang and Toa Payoh in November 1987 to the Circle Line closing its loop in July 2026, and it sets out the dates in a single table. For the lines as they run today, see our MRT and LRT guide; for where every station sits, see the network map.
Dates in this article come from two public sources. For the first months of the system we use the National Heritage Board's account of the MRT's opening. For later stages we use LTA's table of rail network length, whose notes record the month and year each line, stage and extension entered service, together with LTA's own announcements for the stations that opened after 2024.
The first network, 1987 to 1990
On 7 November 1987 the first five stations opened, from Yio Chu Kang to Toa Payoh, and thousands of people came to ride on the first day. A month later, on 12 December 1987, nine more stations carried trains from Novena through Orchard and the city to Outram Park. Dhoby Ghaut, in that December stretch, became the first station where three lines would later meet.
The system's official launch came on 12 March 1988, when the stations from Tiong Bahru to Clementi opened in the west. The National Heritage Board notes that by April 1988 the MRT was already part of the daily commute for at least 200,000 people.
Over the next two years the original network was completed: west to Lakeside and Boon Lay, north to Yishun, east through Bugis, Paya Lebar and Bedok to Tanah Merah and Pasir Ris, and the branch from Jurong East to Choa Chu Kang. LTA's East-West Line page dates the line's completion to Boon Lay to 1990. At that point Singapore had two lines, the North-South Line and the East-West Line.

Closing the north loop and the first light rail, 1996 to 2002
The North-South Line originally ended at Choa Chu Kang in the west and Yishun in the north, with a gap across the north of the island. The Woodlands Extension of 1996 closed it, linking Choa Chu Kang and Yishun through Kranji, Woodlands, Admiralty and Sembawang. Since then the North-South Line has run as one continuous route that swings around the top of the island.
Light rail arrived in 1999 with the Bukit Panjang LRT, the first of three feeder systems built to carry residents from their estates to the MRT. In 2002 the airport branch of the East-West Line reached Changi Airport, giving the terminal a direct rail link through Tanah Merah and Expo; our Changi Airport by MRT article explains how that branch works today.
A new kind of line, 2003 to 2005
The North East Line opened in 2003 and changed what an MRT line could be. It runs underground for its whole length, and LTA describes it as the world's first fully automated underground driverless heavy rail line. It was also the first line in Singapore designed from the start for passengers with disabilities, with lifts and a tactile guidance system; our accessibility article follows how those features spread to the rest of the network.
The same year brought the Sengkang LRT, and in January 2005 the Punggol LRT followed, completing the trio of light rail systems that still serve those two towns.
The Circle Line, 2009 to 2012
The Circle Line was built in stages over several years, each joining the network as it was finished. Stage 3 opened first, on 28 May 2009, from Bartley to Marymount. On 17 April 2010 Stages 1 and 2 followed, taking the line from Dhoby Ghaut through the Marina Centre area to Bartley. Stages 4 and 5, opened on 8 October 2011, carried it from Marymount around the west through Botanic Gardens and Buona Vista to HarbourFront. On 14 January 2012 the Circle Line Extension added Bayfront and Marina Bay.
In February 2009, between those stages, the East-West Line's Boon Lay Extension opened, adding Pioneer and Joo Koon in the far west.
The Downtown Line and the far ends, 2013 to 2017
The Downtown Line also opened in three stages. Stage 1, a six-station stretch in the city through Bugis, Promenade, Bayfront, Downtown, Telok Ayer and Chinatown, began service on 22 December 2013. Stage 2, from Bukit Panjang through Bukit Timah to Rochor, followed on 27 December 2015. Stage 3, from Fort Canning through Bencoolen, Geylang Bahru and MacPherson to Bedok North, Tampines and Expo, opened on 21 October 2017.
At the ends of the older lines, the North-South Line Extension opened in November 2014, taking it beyond Marina Bay to Marina South Pier, and the Tuas West Extension opened in June 2017, extending the East-West Line from Joo Koon to Tuas Link.
Small changes on a mature network, 2019
Two changes in 2019 show how the network keeps adjusting. On 13 January 2019 the Bukit Panjang LRT's Ten Mile Junction station closed. Later that year Canberra station opened on the North-South Line between Sembawang and Yishun, an in-fill station on track that was already in service.
The Thomson-East Coast Line, 2020 to 2024
The Thomson-East Coast Line, the sixth MRT line, opened in four stages over four and a half years. Stage 1, at the northern end around Woodlands, opened on 31 January 2020. Stage 2, from Springleaf to Caldecott, followed on 28 August 2021, and Stage 3, through Stevens, Orchard, Outram Park and Marina Bay to Gardens by the Bay, on 13 November 2022. Stage 4 opened on 23 June 2024, from Tanjong Rhu along the East Coast to Bayshore, bringing the MRT to Marine Parade for the first time. LTA notes that every entrance of the new stations, from this line onwards, is barrier-free.
Recent additions, 2024 to 2026
The pace has stayed high since the Thomson-East Coast Line reached the East Coast. Teck Lee opened on the Punggol LRT on 15 August 2024, and Punggol Coast opened on 10 December 2024, extending the North East Line beyond Punggol. Hume, an in-fill station on the Downtown Line between Hillview and Beauty World, opened on 28 February 2025. Finally, on 12 July 2026, Circle Line Stage 6 opened Keppel, Cantonment and Prince Edward Road and joined HarbourFront to Marina Bay, so that the Circle Line now runs as a complete loop. Our Circle Line Stage 6 article covers the codes that changed.
Every stage in one table
| Date | Line or stage | What opened |
|---|---|---|
| 7 Nov 1987 | North-South Line | First five stations, Yio Chu Kang to Toa Payoh |
| 12 Dec 1987 | North-South and East-West lines | Nine stations, Novena to Outram Park |
| 12 Mar 1988 | East-West Line | Tiong Bahru to Clementi; official launch of the MRT |
| 1988 to 1990 | North-South and East-West lines | The rest of the original network, completed to Boon Lay in 1990 |
| 1996 | North-South Line | Woodlands Extension, linking Choa Chu Kang and Yishun |
| 1999 | Bukit Panjang LRT | The first LRT system |
| 2002 | East-West Line | Changi Airport branch |
| 2003 | North East Line and Sengkang LRT | Both lines opened |
| Jan 2005 | Punggol LRT | The third LRT system |
| Feb 2009 | East-West Line | Boon Lay Extension |
| 28 May 2009 | Circle Line | Stage 3 |
| 17 Apr 2010 | Circle Line | Stages 1 and 2 |
| 8 Oct 2011 | Circle Line | Stages 4 and 5 |
| 14 Jan 2012 | Circle Line | Extension to Bayfront and Marina Bay |
| 22 Dec 2013 | Downtown Line | Stage 1 |
| Nov 2014 | North-South Line | Extension to Marina South Pier |
| 27 Dec 2015 | Downtown Line | Stage 2 |
| Jun 2017 | East-West Line | Tuas West Extension |
| 21 Oct 2017 | Downtown Line | Stage 3 |
| 2019 | North-South Line | Canberra station |
| 31 Jan 2020 | Thomson-East Coast Line | Stage 1 |
| 28 Aug 2021 | Thomson-East Coast Line | Stage 2 |
| 13 Nov 2022 | Thomson-East Coast Line | Stage 3 |
| 23 Jun 2024 | Thomson-East Coast Line | Stage 4 |
| 15 Aug 2024 | Punggol LRT | Teck Lee station |
| 10 Dec 2024 | North East Line | Punggol Coast |
| 28 Feb 2025 | Downtown Line | Hume station |
| 12 Jul 2026 | Circle Line | Stage 6, closing the loop |
How the network's length grew
LTA's yearly figures for route length show the same story in kilometres. The MRT measured 109.4 km from 2005 to 2008. The Circle Line and the Boon Lay Extension lifted it to 148.9 km by the end of 2012, and the Downtown Line and the Tuas West Extension took it to 199.3 km by the end of 2017. The Thomson-East Coast Line's four stages brought the figure to 242.5 km at the end of 2024, unchanged at the end of 2025. Over the same years the three LRT systems stayed at 28.8 km, so the whole rail network measured 271.3 km at the end of 2025, before Circle Line Stage 6.
| End of year | MRT (km) | LRT (km) | All rail (km) |
|---|---|---|---|
| 2005 | 109.4 | 28.8 | 138.2 |
| 2009 | 118.9 | 28.8 | 147.7 |
| 2011 | 146.5 | 28.8 | 175.3 |
| 2013 | 153.2 | 28.8 | 182.0 |
| 2015 | 170.8 | 28.8 | 199.6 |
| 2017 | 199.3 | 28.8 | 228.1 |
| 2020 | 203.5 | 28.8 | 232.3 |
| 2022 | 229.7 | 28.8 | 258.5 |
| 2024 | 242.5 | 28.8 | 271.3 |
What the history means for neighbourhoods
The order in which lines opened still shapes daily life. Towns on the first two lines, such as Toa Payoh, Ang Mo Kio, Bedok and Clementi, have had a station at their centre for more than thirty years. Areas reached only by the newer lines, such as Bukit Timah on the Downtown Line and Marine Parade on the Thomson-East Coast Line, gained rail within the last decade. The next chapter belongs to the west and north-east, where the Jurong Region and Cross Island lines are under construction; our future lines timeline lists every opening LTA has announced.
Frequently asked questions
When did Singapore's MRT open?
On 7 November 1987, with five stations from Yio Chu Kang to Toa Payoh. The official launch of the system followed on 12 March 1988.
Which is the oldest MRT line?
The North-South Line, whose first stations opened in November 1987. The East-West Line followed a month later.
Which line opened most recently?
The Thomson-East Coast Line, whose first stage opened in January 2020 and fourth stage in June 2024. The most recent opening on any line was Circle Line Stage 6, on 12 July 2026.
When was the Circle Line completed?
On 12 July 2026, when Stage 6 opened Keppel, Cantonment and Prince Edward Road and joined HarbourFront to Marina Bay.
Sources
- National Heritage Board, Roots.sg: The Mass Rapid Transit (first stations on 7 November 1987, Novena to Outram Park on 12 December 1987, official launch on 12 March 1988).
- Land Transport Authority, Rail Length (km) at End-of-Year, with notes on the opening of each line, stage and extension.
- Land Transport Authority, pages for each MRT and LRT line, and news releases on Teck Lee, Punggol Coast, Hume and Circle Line Stage 6.
- SBS Transit, opening dates of the North East Line, Sengkang LRT and Punggol LRT; SMRT and LTA, Circle Line stage dates and the closure of Ten Mile Junction.